Why renovation budgets fail

Because the number was agreed from a walkthrough, before anyone opened a wall.

A typical week Mon Assess Tue Cost Wed Permit Thu Renovate Fri Document
How we work

Cost it properly, then decide

A renovation budget set by walking a property and estimating is a wish. The real figure appears when trades price the actual scope and someone has looked behind the drywall at the parts that decide everything — the roof deck, the panel, the supply lines.

Contingency is the second failure. Ten per cent applied out of habit to a 1960s block house with original plumbing is not a contingency, it is a rounding error. The allowance should reflect the age and the unknowns of that specific building.

And permits are where short-term thinking costs most. Skipping them saves weeks and surfaces years later in a title search or an inspection, as somebody else's problem and the seller's liability. Pulling them, attending the inspections and closing them out is the cheap version of that decision.

Our principles

Three beliefs behind the method

Cost with trades

Not from a spreadsheet or a walkthrough.

Permit and close out

Open permits follow the property.

No offering here

Nothing on this site solicits investment.

Want to get in touch?

Property and trade enquiries welcome. Not an investment enquiry line.